{"product_id":"tay100050l-rear-wheel-bearing-hub-with-long-lead-abs-sensor-for-discovery-2","title":"Rear Wheel Bearing Hub With Long Lead ABS Sensor for Discovery 2 (1998 – 2004) Includes Seal and ABS Sensor – TAY100050L","description":"\u003cp\u003eReplacement rear wheel hub bearing assembly complete with ABS sensor with extra long lead.\u003c\/p\u003e\n\n\u003cp\u003eLand Rover recognised that on some Discovery 2 vehicles the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with this type of ABS sensor and lead.\u003c\/p\u003e\n\n \u003cp\u003e(ABS SENSOR LEAD DOES NOT COME WITH PLUG, PLUG FROM OLD SENSOR NEEDS SOLDERING ON TO THE NEW LEAD)\u003c\/p\u003e\n\n\u003cp\u003eA quality replacement part, equivalent to Land Rover part number TAY100050\u003c\/p\u003e\n\n \u003cp\u003eSuitable for the following models:\u003cbr\u003e\nLand Rover:  Discovery 2, All models, 1998-2004, REAR\u003c\/p\u003e","brand":"Britpart","offers":[{"title":"Default Title","offer_id":55817162621272,"sku":"TAY100050L","price":90.79,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/0070\/6392\/files\/TAY100050L__54688-600x600.jpg?v=1758822521","url":"https:\/\/thomasperformance.co.uk\/products\/tay100050l-rear-wheel-bearing-hub-with-long-lead-abs-sensor-for-discovery-2","provider":"Thomas Performance Ltd","version":"1.0","type":"link"}