fbpx

BLACK FRIDAY SALE! 10% off our LED Headlights on now!

Thomas Performance Ltd, Land Rover Parts and Accessories.

http://schema.org/InStock

Discovery 2 Front Wheel Bearing Hub With Extra Long Lead ABS Sensor

Brand: Britpart
Product Code: TAY100060L
Availability: In Stock

Price: £90.79
Ex Tax: £75.66

- +
A quality replacement, front wheel hub bearing assembly complete with an ABS sensor with extra long lead. Land Rover recognised that on some Discovery 2 vehicles, the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with ABS sensor and lead. PLACEMENT: Front, left, right EQUIVALENT TO LAND ROVER PART NUMBER(S): TAY100060 SUITABLE FOR THE FOLLOWING LAND ROVER MODELS: Discovery 2, 1998-2004, All models, Front, left, right
There are no reviews for this product.
Write a review
BadExcellent
Facebook comment

Filter Products

Manufacturers
  • + Show 22 more
Suitable for Vehicles
Suitable for Models
  • + Show 18 more